{"id":17614,"date":"2018-05-11T20:16:01","date_gmt":"2018-05-11T17:16:01","guid":{"rendered":"http:\/\/www.onisilos.gr\/?p=17614"},"modified":"2018-05-11T20:16:01","modified_gmt":"2018-05-11T17:16:01","slug":"egypt-eni-starts-up-third-production-unit-at-zohr","status":"publish","type":"post","link":"https:\/\/www.onisilos.gr\/?p=17614","title":{"rendered":"Egypt: Eni starts up third production unit at Zohr"},"content":{"rendered":"<p style=\"text-align: justify;\">\n<p style=\"text-align: justify;\"><span style=\"font-size: 12pt;\"><b>10 May 2018<\/b><\/span><\/p>\n<p style=\"text-align: justify;\"><span style=\"font-size: 12pt;\"><i>After a record start-up in less than two and a half years from discovery, production is continuing to ramp up, reaching plateau in 2019<\/i><\/span><\/p>\n<p style=\"text-align: justify;\"><span style=\"font-size: 12pt;\"><a href=\"http:\/\/www.eni.com\/\"><b><i>Eni<\/i><\/b><\/a> has announced the <b><i>start-up of the third production unit (T-2) of the Zohr project<\/i><\/b>, increasing the installed capacity to 1.2 bcfd. Zohr is now producing 1.1 bcfd in ramp-up, equivalent to approx. 200,000 boed, of which 75,000 boed net to Eni at current working interest. This outstanding result has been achieved only a few months after the field\u2019s start-up in December 2017.<\/span><\/p>\n<p style=\"text-align: justify;\"><span style=\"font-size: 12pt;\">The third unit, following just one week after the second unit\u2019s successful power-up, confirms the programme pursued by Eni, its co-venturers and Egyptian Natural Gas Holding Company (EGAS) to pursue a production level of 2 bcfd by end 2018, followed by a plateau of 2.7 bcfd in 2019.<\/span><\/p>\n<p style=\"text-align: justify;\"><span style=\"font-size: 12pt;\"><!--more--><\/span><\/p>\n<p style=\"text-align: justify;\"><span style=\"font-size: 12pt;\">The latest achievement reinforces the exceptional development path of Zohr, one of Eni\u2019s seven record-breaking projects, which is playing a fundamental role in supporting Egypt\u2019s independence from LNG imports.<\/span><\/p>\n<p style=\"text-align: justify;\"><span style=\"font-size: 12pt;\">The<b><i> Zohr field<\/i><\/b>, the largest gas discovery ever made in Egypt and in the Mediterranean Sea with more than 30 tcf of gas in place, is located within the offshore <b><i>Shorouk Block<\/i><\/b> (some 190 km north of Port Said). In the Shorouk Block, <b><i>Eni<\/i><\/b> holds a 60% stake, <b><i>Rosneft<\/i><\/b> 30% and <b><i>BP<\/i><\/b> 10% of the Contractor\u2019s Share (where Eni, Roseneft and BP are collectivity the Contractor).<\/span><\/p>\n<p style=\"text-align: justify;\"><span style=\"font-size: 12pt;\">The project is executed by <b><i>Petrobel<\/i><\/b>, the Operating Company jointly held by <b><i>Eni<\/i><\/b> and the state corporation <b><i>Egyptian General Petroleum Corporation (EGPC)<\/i><\/b>, on behalf of <b><i>Petroshorouk,<\/i><\/b> jointly held by<b><i> Contractor (Eni and its partners) <\/i><\/b>and the state company <b><i>Egyptian Natural Gas holding Company (EGAS)<\/i><\/b>.<\/span><\/p>\n<figure id=\"attachment_17615\" aria-describedby=\"caption-attachment-17615\" style=\"width: 750px\" class=\"wp-caption aligncenter\"><img loading=\"lazy\" decoding=\"async\" class=\"wp-image-17615 size-full\" src=\"http:\/\/www.onisilos.gr\/wp-content\/uploads\/2018\/05\/zohr.jpg\" alt=\"\" width=\"750\" height=\"398\" srcset=\"https:\/\/www.onisilos.gr\/wp-content\/uploads\/2018\/05\/zohr.jpg 750w, https:\/\/www.onisilos.gr\/wp-content\/uploads\/2018\/05\/zohr-300x159.jpg 300w, https:\/\/www.onisilos.gr\/wp-content\/uploads\/2018\/05\/zohr-600x318.jpg 600w\" sizes=\"auto, (max-width: 750px) 100vw, 750px\" \/><figcaption id=\"caption-attachment-17615\" class=\"wp-caption-text\"><\/span> <span style=\"font-size: 12pt;\">Location of Shorouk Concession and Zohr gas field (Source: Eni)<\/span><\/figcaption><\/figure>\n<p style=\"text-align: justify;\">\n<p style=\"text-align: justify;\"><span style=\"font-size: 12pt;\">Eni has been present in Egypt since 1954, where it operates through its subsidiary IEOC. The company is the country&#8217;s leading producer with equity of more than 260,000 barrels of oil equivalent per day.<\/span><\/p>\n<p style=\"text-align: justify;\"><a href=\"https:\/\/www.eni.com\/en_IT\/media\/2018\/05\/zohr-ramp-up-eni-starts-up-the-third-production-unit\"><span style=\"font-size: 12pt;\"><b>Original article link<\/b><\/span><\/a><\/p>\n<p style=\"text-align: justify;\"><span style=\"font-size: 12pt;\">source:https:\/\/www.energy-pedia.com\/news\/egypt\/eni-starts-up&#8211;third-production-unit-at-zohr-173568<\/span><\/p>\n","protected":false},"excerpt":{"rendered":"<p>10 May 2018 After a record start-up in less than two and a half years from discovery, production is continuing to ramp up, reaching plateau in 2019 Eni has announced &hellip; <\/p>\n<div class='heateorSssClear'><\/div><div  class='heateor_sss_sharing_container heateor_sss_horizontal_sharing' data-heateor-sss-href='https:\/\/www.onisilos.gr\/?p=17614'><div class='heateor_sss_sharing_title' style=\"font-weight:bold\" ><\/div><div class=\"heateor_sss_sharing_ul\"><a aria-label=\"Facebook\" class=\"heateor_sss_facebook\" href=\"https:\/\/www.facebook.com\/sharer\/sharer.php?u=https%3A%2F%2Fwww.onisilos.gr%2Findex.php%3Frest_route%3D%252Fwp%252Fv2%252Fposts%252F17614\" title=\"Facebook\" rel=\"nofollow noopener\" target=\"_blank\" style=\"font-size:32px!important;box-shadow:none;display:inline-block;vertical-align:middle\"><span class=\"heateor_sss_square_count heateor_sss_facebook_count\">&nbsp;<\/span><span class=\"heateor_sss_svg\" style=\"background-color:#0765FE;width:30px;height:30px;display:inline-block;opacity:1;float:left;font-size:32px;box-shadow:none;display:inline-block;font-size:16px;padding:0 4px;vertical-align:middle;background-repeat:repeat;overflow:hidden;padding:0;cursor:pointer;box-sizing:content-box\"><svg style=\"display:block;\" focusable=\"false\" aria-hidden=\"true\" xmlns=\"http:\/\/www.w3.org\/2000\/svg\" width=\"100%\" height=\"100%\" viewBox=\"0 0 32 32\"><path fill=\"#fff\" d=\"M28 16c0-6.627-5.373-12-12-12S4 9.373 4 16c0 5.628 3.875 10.35 9.101 11.647v-7.98h-2.474V16H13.1v-1.58c0-4.085 1.849-5.978 5.859-5.978.76 0 2.072.15 2.608.298v3.325c-.283-.03-.775-.045-1.386-.045-1.967 0-2.728.745-2.728 2.683V16h3.92l-.673 3.667h-3.247v8.245C23.395 27.195 28 22.135 28 16Z\"><\/path><\/svg><\/span><\/a><a aria-label=\"Twitter\" class=\"heateor_sss_button_twitter\" href=\"https:\/\/twitter.com\/intent\/tweet?text=Egypt%3A%20Eni%20starts%20up%20third%20production%20unit%20at%20Zohr&url=https%3A%2F%2Fwww.onisilos.gr%2Findex.php%3Frest_route%3D%252Fwp%252Fv2%252Fposts%252F17614\" title=\"Twitter\" rel=\"nofollow noopener\" target=\"_blank\" style=\"font-size:32px!important;box-shadow:none;display:inline-block;vertical-align:middle\"><span class=\"heateor_sss_square_count heateor_sss_twitter_count\">&nbsp;<\/span><span class=\"heateor_sss_svg heateor_sss_s__default heateor_sss_s_twitter\" style=\"background-color:#55acee;width:30px;height:30px;display:inline-block;opacity:1;float:left;font-size:32px;box-shadow:none;display:inline-block;font-size:16px;padding:0 4px;vertical-align:middle;background-repeat:repeat;overflow:hidden;padding:0;cursor:pointer;box-sizing:content-box\"><svg style=\"display:block;\" focusable=\"false\" aria-hidden=\"true\" xmlns=\"http:\/\/www.w3.org\/2000\/svg\" width=\"100%\" height=\"100%\" viewBox=\"-4 -4 39 39\"><path d=\"M28 8.557a9.913 9.913 0 0 1-2.828.775 4.93 4.93 0 0 0 2.166-2.725 9.738 9.738 0 0 1-3.13 1.194 4.92 4.92 0 0 0-3.593-1.55 4.924 4.924 0 0 0-4.794 6.049c-4.09-.21-7.72-2.17-10.15-5.15a4.942 4.942 0 0 0-.665 2.477c0 1.71.87 3.214 2.19 4.1a4.968 4.968 0 0 1-2.23-.616v.06c0 2.39 1.7 4.38 3.952 4.83-.414.115-.85.174-1.297.174-.318 0-.626-.03-.928-.086a4.935 4.935 0 0 0 4.6 3.42 9.893 9.893 0 0 1-6.114 2.107c-.398 0-.79-.023-1.175-.068a13.953 13.953 0 0 0 7.55 2.213c9.056 0 14.01-7.507 14.01-14.013 0-.213-.005-.426-.015-.637.96-.695 1.795-1.56 2.455-2.55z\" fill=\"#fff\"><\/path><\/svg><\/span><\/a><\/div><div class=\"heateorSssClear\"><\/div><\/div><div class='heateorSssClear'><\/div>","protected":false},"author":1,"featured_media":17615,"comment_status":"closed","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[9],"tags":[6712],"class_list":["post-17614","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-9","tag-egypt-eni-starts-up-third-production-unit-at-zohr"],"aioseo_notices":[],"aioseo_head":"\n\t\t<!-- All in One SEO 4.9.9 - aioseo.com -->\n\t<meta name=\"description\" content=\"10 May 2018 After a record start-up in less than two and a half years from discovery, production is continuing to ramp up, reaching plateau in 2019 Eni has announced the start-up of the third production unit (T-2) of the Zohr project, increasing the installed capacity to 1.2 bcfd. Zohr is now producing 1.1 bcfd\" \/>\n\t<meta name=\"robots\" content=\"max-image-preview:large\" \/>\n\t<meta name=\"author\" content=\"\u039f\u03bd\u03ae\u03c3\u03b9\u03bb\u03bf\u03c2\"\/>\n\t<link rel=\"canonical\" href=\"https:\/\/www.onisilos.gr\/?p=17614\" \/>\n\t<meta name=\"generator\" content=\"All in One SEO (AIOSEO) 4.9.9\" \/>\n\t\t<meta property=\"og:locale\" content=\"el_GR\" \/>\n\t\t<meta property=\"og:site_name\" content=\"\u039f\u039d\u0397\u03a3\u0399\u039b\u039f\u03a3 \u039f\u039d\u0397\u03a3\u0399\u039b\u039f\u03a3 -\" \/>\n\t\t<meta property=\"og:type\" content=\"article\" \/>\n\t\t<meta property=\"og:title\" content=\"Egypt: Eni starts up third production unit at Zohr - \u039f\u039d\u0397\u03a3\u0399\u039b\u039f\u03a3\" \/>\n\t\t<meta property=\"og:description\" content=\"10 May 2018 After a record start-up in less than two and a half years from discovery, production is continuing to ramp up, reaching plateau in 2019 Eni has announced the start-up of the third production unit (T-2) of the Zohr project, increasing the installed capacity to 1.2 bcfd. Zohr is now producing 1.1 bcfd\" \/>\n\t\t<meta property=\"og:url\" content=\"https:\/\/www.onisilos.gr\/?p=17614\" \/>\n\t\t<meta property=\"article:published_time\" content=\"2018-05-11T17:16:01+00:00\" \/>\n\t\t<meta property=\"article:modified_time\" content=\"2018-05-11T17:16:01+00:00\" \/>\n\t\t<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n\t\t<meta name=\"twitter:site\" content=\"@\u039f\u03bd\u03ae\u03c3\u03b9\u03bb\u03bf\u03c2\" \/>\n\t\t<meta name=\"twitter:title\" content=\"Egypt: Eni starts up third production unit at Zohr - \u039f\u039d\u0397\u03a3\u0399\u039b\u039f\u03a3\" \/>\n\t\t<meta name=\"twitter:description\" content=\"10 May 2018 After a record start-up in less than two and a half years from discovery, production is continuing to ramp up, reaching plateau in 2019 Eni has announced the start-up of the third production unit (T-2) of the Zohr project, increasing the installed capacity to 1.2 bcfd. Zohr is now producing 1.1 bcfd\" \/>\n\t\t<meta name=\"twitter:creator\" content=\"@\u039f\u03bd\u03ae\u03c3\u03b9\u03bb\u03bf\u03c2\" \/>\n\t\t<script type=\"application\/ld+json\" class=\"aioseo-schema\">\n\t\t\t{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"BlogPosting\",\"@id\":\"https:\\\/\\\/www.onisilos.gr\\\/?p=17614#blogposting\",\"name\":\"Egypt: Eni starts up third production unit at Zohr - \\u039f\\u039d\\u0397\\u03a3\\u0399\\u039b\\u039f\\u03a3\",\"headline\":\"Egypt: Eni starts up third production unit at Zohr\",\"author\":{\"@id\":\"https:\\\/\\\/www.onisilos.gr\\\/?author=1#author\"},\"publisher\":{\"@id\":\"https:\\\/\\\/www.onisilos.gr\\\/#organization\"},\"image\":{\"@type\":\"ImageObject\",\"url\":\"https:\\\/\\\/www.onisilos.gr\\\/wp-content\\\/uploads\\\/2018\\\/05\\\/zohr.jpg\",\"width\":750,\"height\":398},\"datePublished\":\"2018-05-11T20:16:01+03:00\",\"dateModified\":\"2018-05-11T20:16:01+03:00\",\"inLanguage\":\"el\",\"mainEntityOfPage\":{\"@id\":\"https:\\\/\\\/www.onisilos.gr\\\/?p=17614#webpage\"},\"isPartOf\":{\"@id\":\"https:\\\/\\\/www.onisilos.gr\\\/?p=17614#webpage\"},\"articleSection\":\"\\u0391\\u03a3\\u03a6\\u0391\\u039b\\u0395\\u0399\\u0391-\\u0391\\u039c\\u03a5\\u039d\\u0391, Egypt: Eni starts up third production unit at Zohr\"},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/www.onisilos.gr\\\/?p=17614#breadcrumblist\",\"itemListElement\":[{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/www.onisilos.gr#listItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/www.onisilos.gr\",\"nextItem\":{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/www.onisilos.gr\\\/?cat=9#listItem\",\"name\":\"\\u0391\\u03a3\\u03a6\\u0391\\u039b\\u0395\\u0399\\u0391-\\u0391\\u039c\\u03a5\\u039d\\u0391\"}},{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/www.onisilos.gr\\\/?cat=9#listItem\",\"position\":2,\"name\":\"\\u0391\\u03a3\\u03a6\\u0391\\u039b\\u0395\\u0399\\u0391-\\u0391\\u039c\\u03a5\\u039d\\u0391\",\"item\":\"https:\\\/\\\/www.onisilos.gr\\\/?cat=9\",\"nextItem\":{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/www.onisilos.gr\\\/?p=17614#listItem\",\"name\":\"Egypt: Eni starts up third production unit at Zohr\"},\"previousItem\":{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/www.onisilos.gr#listItem\",\"name\":\"Home\"}},{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/www.onisilos.gr\\\/?p=17614#listItem\",\"position\":3,\"name\":\"Egypt: Eni starts up third production unit at Zohr\",\"previousItem\":{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/www.onisilos.gr\\\/?cat=9#listItem\",\"name\":\"\\u0391\\u03a3\\u03a6\\u0391\\u039b\\u0395\\u0399\\u0391-\\u0391\\u039c\\u03a5\\u039d\\u0391\"}}]},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/www.onisilos.gr\\\/#organization\",\"name\":\"\\u039f\\u039d\\u0397\\u03a3\\u0399\\u039b\\u039f\\u03a3\",\"url\":\"https:\\\/\\\/www.onisilos.gr\\\/\",\"sameAs\":[\"https:\\\/\\\/www.facebook.com\\\/profile.php?id=100094309810138\",\"https:\\\/\\\/x.com\\\/\\u039f\\u03bd\\u03ae\\u03c3\\u03b9\\u03bb\\u03bf\\u03c2\"]},{\"@type\":\"Person\",\"@id\":\"https:\\\/\\\/www.onisilos.gr\\\/?author=1#author\",\"url\":\"https:\\\/\\\/www.onisilos.gr\\\/?author=1\",\"name\":\"\\u039f\\u03bd\\u03ae\\u03c3\\u03b9\\u03bb\\u03bf\\u03c2\",\"image\":{\"@type\":\"ImageObject\",\"@id\":\"https:\\\/\\\/www.onisilos.gr\\\/?p=17614#authorImage\",\"url\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/119f591f2b14bcc7982fd18742e68fea24ce95caea8098e6a5cddd4d82d8a389?s=96&d=mm&r=g\",\"width\":96,\"height\":96,\"caption\":\"\\u039f\\u03bd\\u03ae\\u03c3\\u03b9\\u03bb\\u03bf\\u03c2\"}},{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/www.onisilos.gr\\\/?p=17614#webpage\",\"url\":\"https:\\\/\\\/www.onisilos.gr\\\/?p=17614\",\"name\":\"Egypt: Eni starts up third production unit at Zohr - \\u039f\\u039d\\u0397\\u03a3\\u0399\\u039b\\u039f\\u03a3\",\"description\":\"10 May 2018 After a record start-up in less than two and a half years from discovery, production is continuing to ramp up, reaching plateau in 2019 Eni has announced the start-up of the third production unit (T-2) of the Zohr project, increasing the installed capacity to 1.2 bcfd. Zohr is now producing 1.1 bcfd\",\"inLanguage\":\"el\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/www.onisilos.gr\\\/#website\"},\"breadcrumb\":{\"@id\":\"https:\\\/\\\/www.onisilos.gr\\\/?p=17614#breadcrumblist\"},\"author\":{\"@id\":\"https:\\\/\\\/www.onisilos.gr\\\/?author=1#author\"},\"creator\":{\"@id\":\"https:\\\/\\\/www.onisilos.gr\\\/?author=1#author\"},\"image\":{\"@type\":\"ImageObject\",\"url\":\"https:\\\/\\\/www.onisilos.gr\\\/wp-content\\\/uploads\\\/2018\\\/05\\\/zohr.jpg\",\"@id\":\"https:\\\/\\\/www.onisilos.gr\\\/?p=17614\\\/#mainImage\",\"width\":750,\"height\":398},\"primaryImageOfPage\":{\"@id\":\"https:\\\/\\\/www.onisilos.gr\\\/?p=17614#mainImage\"},\"datePublished\":\"2018-05-11T20:16:01+03:00\",\"dateModified\":\"2018-05-11T20:16:01+03:00\"},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/www.onisilos.gr\\\/#website\",\"url\":\"https:\\\/\\\/www.onisilos.gr\\\/\",\"name\":\"\\u039f\\u039d\\u0397\\u03a3\\u0399\\u039b\\u039f\\u03a3\",\"inLanguage\":\"el\",\"publisher\":{\"@id\":\"https:\\\/\\\/www.onisilos.gr\\\/#organization\"}}]}\n\t\t<\/script>\n\t\t<!-- All in One SEO -->\n\n","aioseo_head_json":{"title":"Egypt: Eni starts up third production unit at Zohr - \u039f\u039d\u0397\u03a3\u0399\u039b\u039f\u03a3","description":"10 May 2018 After a record start-up in less than two and a half years from discovery, production is continuing to ramp up, reaching plateau in 2019 Eni has announced the start-up of the third production unit (T-2) of the Zohr project, increasing the installed capacity to 1.2 bcfd. Zohr is now producing 1.1 bcfd","canonical_url":"https:\/\/www.onisilos.gr\/?p=17614","robots":"max-image-preview:large","keywords":"","webmasterTools":{"miscellaneous":""},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"BlogPosting","@id":"https:\/\/www.onisilos.gr\/?p=17614#blogposting","name":"Egypt: Eni starts up third production unit at Zohr - \u039f\u039d\u0397\u03a3\u0399\u039b\u039f\u03a3","headline":"Egypt: Eni starts up third production unit at Zohr","author":{"@id":"https:\/\/www.onisilos.gr\/?author=1#author"},"publisher":{"@id":"https:\/\/www.onisilos.gr\/#organization"},"image":{"@type":"ImageObject","url":"https:\/\/www.onisilos.gr\/wp-content\/uploads\/2018\/05\/zohr.jpg","width":750,"height":398},"datePublished":"2018-05-11T20:16:01+03:00","dateModified":"2018-05-11T20:16:01+03:00","inLanguage":"el","mainEntityOfPage":{"@id":"https:\/\/www.onisilos.gr\/?p=17614#webpage"},"isPartOf":{"@id":"https:\/\/www.onisilos.gr\/?p=17614#webpage"},"articleSection":"\u0391\u03a3\u03a6\u0391\u039b\u0395\u0399\u0391-\u0391\u039c\u03a5\u039d\u0391, Egypt: Eni starts up third production unit at Zohr"},{"@type":"BreadcrumbList","@id":"https:\/\/www.onisilos.gr\/?p=17614#breadcrumblist","itemListElement":[{"@type":"ListItem","@id":"https:\/\/www.onisilos.gr#listItem","position":1,"name":"Home","item":"https:\/\/www.onisilos.gr","nextItem":{"@type":"ListItem","@id":"https:\/\/www.onisilos.gr\/?cat=9#listItem","name":"\u0391\u03a3\u03a6\u0391\u039b\u0395\u0399\u0391-\u0391\u039c\u03a5\u039d\u0391"}},{"@type":"ListItem","@id":"https:\/\/www.onisilos.gr\/?cat=9#listItem","position":2,"name":"\u0391\u03a3\u03a6\u0391\u039b\u0395\u0399\u0391-\u0391\u039c\u03a5\u039d\u0391","item":"https:\/\/www.onisilos.gr\/?cat=9","nextItem":{"@type":"ListItem","@id":"https:\/\/www.onisilos.gr\/?p=17614#listItem","name":"Egypt: Eni starts up third production unit at Zohr"},"previousItem":{"@type":"ListItem","@id":"https:\/\/www.onisilos.gr#listItem","name":"Home"}},{"@type":"ListItem","@id":"https:\/\/www.onisilos.gr\/?p=17614#listItem","position":3,"name":"Egypt: Eni starts up third production unit at Zohr","previousItem":{"@type":"ListItem","@id":"https:\/\/www.onisilos.gr\/?cat=9#listItem","name":"\u0391\u03a3\u03a6\u0391\u039b\u0395\u0399\u0391-\u0391\u039c\u03a5\u039d\u0391"}}]},{"@type":"Organization","@id":"https:\/\/www.onisilos.gr\/#organization","name":"\u039f\u039d\u0397\u03a3\u0399\u039b\u039f\u03a3","url":"https:\/\/www.onisilos.gr\/","sameAs":["https:\/\/www.facebook.com\/profile.php?id=100094309810138","https:\/\/x.com\/\u039f\u03bd\u03ae\u03c3\u03b9\u03bb\u03bf\u03c2"]},{"@type":"Person","@id":"https:\/\/www.onisilos.gr\/?author=1#author","url":"https:\/\/www.onisilos.gr\/?author=1","name":"\u039f\u03bd\u03ae\u03c3\u03b9\u03bb\u03bf\u03c2","image":{"@type":"ImageObject","@id":"https:\/\/www.onisilos.gr\/?p=17614#authorImage","url":"https:\/\/secure.gravatar.com\/avatar\/119f591f2b14bcc7982fd18742e68fea24ce95caea8098e6a5cddd4d82d8a389?s=96&d=mm&r=g","width":96,"height":96,"caption":"\u039f\u03bd\u03ae\u03c3\u03b9\u03bb\u03bf\u03c2"}},{"@type":"WebPage","@id":"https:\/\/www.onisilos.gr\/?p=17614#webpage","url":"https:\/\/www.onisilos.gr\/?p=17614","name":"Egypt: Eni starts up third production unit at Zohr - \u039f\u039d\u0397\u03a3\u0399\u039b\u039f\u03a3","description":"10 May 2018 After a record start-up in less than two and a half years from discovery, production is continuing to ramp up, reaching plateau in 2019 Eni has announced the start-up of the third production unit (T-2) of the Zohr project, increasing the installed capacity to 1.2 bcfd. Zohr is now producing 1.1 bcfd","inLanguage":"el","isPartOf":{"@id":"https:\/\/www.onisilos.gr\/#website"},"breadcrumb":{"@id":"https:\/\/www.onisilos.gr\/?p=17614#breadcrumblist"},"author":{"@id":"https:\/\/www.onisilos.gr\/?author=1#author"},"creator":{"@id":"https:\/\/www.onisilos.gr\/?author=1#author"},"image":{"@type":"ImageObject","url":"https:\/\/www.onisilos.gr\/wp-content\/uploads\/2018\/05\/zohr.jpg","@id":"https:\/\/www.onisilos.gr\/?p=17614\/#mainImage","width":750,"height":398},"primaryImageOfPage":{"@id":"https:\/\/www.onisilos.gr\/?p=17614#mainImage"},"datePublished":"2018-05-11T20:16:01+03:00","dateModified":"2018-05-11T20:16:01+03:00"},{"@type":"WebSite","@id":"https:\/\/www.onisilos.gr\/#website","url":"https:\/\/www.onisilos.gr\/","name":"\u039f\u039d\u0397\u03a3\u0399\u039b\u039f\u03a3","inLanguage":"el","publisher":{"@id":"https:\/\/www.onisilos.gr\/#organization"}}]},"og:locale":"el_GR","og:site_name":"\u039f\u039d\u0397\u03a3\u0399\u039b\u039f\u03a3 \u039f\u039d\u0397\u03a3\u0399\u039b\u039f\u03a3 -","og:type":"article","og:title":"Egypt: Eni starts up third production unit at Zohr - \u039f\u039d\u0397\u03a3\u0399\u039b\u039f\u03a3","og:description":"10 May 2018 After a record start-up in less than two and a half years from discovery, production is continuing to ramp up, reaching plateau in 2019 Eni has announced the start-up of the third production unit (T-2) of the Zohr project, increasing the installed capacity to 1.2 bcfd. Zohr is now producing 1.1 bcfd","og:url":"https:\/\/www.onisilos.gr\/?p=17614","article:published_time":"2018-05-11T17:16:01+00:00","article:modified_time":"2018-05-11T17:16:01+00:00","twitter:card":"summary_large_image","twitter:site":"@\u039f\u03bd\u03ae\u03c3\u03b9\u03bb\u03bf\u03c2","twitter:title":"Egypt: Eni starts up third production unit at Zohr - \u039f\u039d\u0397\u03a3\u0399\u039b\u039f\u03a3","twitter:description":"10 May 2018 After a record start-up in less than two and a half years from discovery, production is continuing to ramp up, reaching plateau in 2019 Eni has announced the start-up of the third production unit (T-2) of the Zohr project, increasing the installed capacity to 1.2 bcfd. Zohr is now producing 1.1 bcfd","twitter:creator":"@\u039f\u03bd\u03ae\u03c3\u03b9\u03bb\u03bf\u03c2"},"aioseo_meta_data":{"post_id":"17614","title":null,"description":null,"keywords":null,"keyphrases":null,"primary_term":null,"canonical_url":null,"og_title":null,"og_description":null,"og_object_type":"default","og_image_type":"default","og_image_url":null,"og_image_width":null,"og_image_height":null,"og_image_custom_url":null,"og_image_custom_fields":null,"og_video":null,"og_custom_url":null,"og_article_section":null,"og_article_tags":null,"twitter_use_og":false,"twitter_card":"default","twitter_image_type":"default","twitter_image_url":null,"twitter_image_custom_url":null,"twitter_image_custom_fields":null,"twitter_title":null,"twitter_description":null,"schema":{"blockGraphs":[],"customGraphs":[],"default":{"data":{"Article":[],"Course":[],"Dataset":[],"FAQPage":[],"Movie":[],"Person":[],"Product":[],"ProductReview":[],"Car":[],"Recipe":[],"Service":[],"SoftwareApplication":[],"WebPage":[]},"graphName":"","isEnabled":true},"graphs":[]},"schema_type":"default","schema_type_options":null,"pillar_content":false,"robots_default":true,"robots_noindex":false,"robots_noarchive":false,"robots_nosnippet":false,"robots_nofollow":false,"robots_noimageindex":false,"robots_noodp":false,"robots_notranslate":false,"robots_max_snippet":null,"robots_max_videopreview":null,"robots_max_imagepreview":"large","priority":null,"frequency":null,"local_seo":null,"breadcrumb_settings":null,"limit_modified_date":false,"ai":null,"created":"2023-09-25 00:07:56","updated":"2025-06-06 02:15:39","seo_analyzer_scan_date":null},"aioseo_breadcrumb":"<div class=\"aioseo-breadcrumbs\"><span class=\"aioseo-breadcrumb\">\n\t\t\t<a href=\"https:\/\/www.onisilos.gr\" title=\"Home\">Home<\/a>\n\t\t<\/span><span class=\"aioseo-breadcrumb-separator\">&raquo;<\/span><span class=\"aioseo-breadcrumb\">\n\t\t\t<a href=\"https:\/\/www.onisilos.gr\/?cat=9\" title=\"\u0391\u03a3\u03a6\u0391\u039b\u0395\u0399\u0391-\u0391\u039c\u03a5\u039d\u0391\">\u0391\u03a3\u03a6\u0391\u039b\u0395\u0399\u0391-\u0391\u039c\u03a5\u039d\u0391<\/a>\n\t\t<\/span><span class=\"aioseo-breadcrumb-separator\">&raquo;<\/span><span class=\"aioseo-breadcrumb\">\n\t\t\tEgypt: Eni starts up third production unit at Zohr\n\t\t<\/span><\/div>","aioseo_breadcrumb_json":[{"label":"Home","link":"https:\/\/www.onisilos.gr"},{"label":"\u0391\u03a3\u03a6\u0391\u039b\u0395\u0399\u0391-\u0391\u039c\u03a5\u039d\u0391","link":"https:\/\/www.onisilos.gr\/?cat=9"},{"label":"Egypt: Eni starts up third production unit at Zohr","link":"https:\/\/www.onisilos.gr\/?p=17614"}],"_links":{"self":[{"href":"https:\/\/www.onisilos.gr\/index.php?rest_route=\/wp\/v2\/posts\/17614","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.onisilos.gr\/index.php?rest_route=\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.onisilos.gr\/index.php?rest_route=\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.onisilos.gr\/index.php?rest_route=\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.onisilos.gr\/index.php?rest_route=%2Fwp%2Fv2%2Fcomments&post=17614"}],"version-history":[{"count":0,"href":"https:\/\/www.onisilos.gr\/index.php?rest_route=\/wp\/v2\/posts\/17614\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.onisilos.gr\/index.php?rest_route=\/wp\/v2\/media\/17615"}],"wp:attachment":[{"href":"https:\/\/www.onisilos.gr\/index.php?rest_route=%2Fwp%2Fv2%2Fmedia&parent=17614"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.onisilos.gr\/index.php?rest_route=%2Fwp%2Fv2%2Fcategories&post=17614"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.onisilos.gr\/index.php?rest_route=%2Fwp%2Fv2%2Ftags&post=17614"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}